I had hoped to be farther along with the Victorianna’s kitchen by now, but c’est la vie. I’m waiting for a Shapeways stove to come in the mail and thinking through some ideas for scratch built cabinets. In the meantime, I’ve finished the window seat that I started in September. I bought a Lee’s Line […]
Tag: Greenleaf Victorianna (Page 2 of 5)
I’m at the point where I could attach the Victorianna’s roof, but after spending so much time shingling the Rowhouse I just don’t have it in me to do another roof right now. So I moved on to the last room in the house: the kitchen. I wanted to use the same tan wallpaper I […]
I don’t usually put dolls in my dollhouses, but I made an exception when I bought a little resin baby for the nursery. Since then I’ve been keeping an eye out for dolls to put in the other kids’ rooms — I need a little girl (age 4-ish) and an older girl (age 12-ish). An […]
Last week I set out to finish the Victorianna’s master bedroom but only managed to finish the closet. This week I tackled the other side of the room, which has the tower room and two spaces under the sloped ceiling that needed to be filled up. I started by wallpapering the outside of the tower […]
Remember just last week when I said I wasn’t going to start on any big projects until I finished the Rowhouse shingles? I’m going back on my word. I want to get the roof on the Victorianna and to do that I need to finish the three rooms on the third floor. The nursery and […]
I don’t want to start on a new “big” project until the Rowhouse’s shingles are finished, so I have been building furniture kits instead. This week I finished some for the younger little girl’s room in the Victorianna (not to be confused with the nursery). This room has a built-in toy shelf made from an […]
A while ago I used some resin embellishments I had lying around to make knee walls for the Victorianna’s nursery. The one to the left of the tower door would have looked like this. Since then, I finished the master bathroom, which is next to this room. In the bathroom I put a piece of […]
The last time I worked on the Victorianna’s right tower, I had assembled the cupola (a bashed 1:48 gazebo) to look like this. To finish it, I needed to fill those gaps between the wall pieces, and also clean up the platform that goes around the cupola. I cut dowel pieces to fill up the […]
This week I’ve been working on the shower, tub faucet, and trim in the Victorianna’s master bathroom. Everything was in progress at the same time so I’ve divided this post up by topic instead of showing the pictures chronologically. Shower To make the shower floor, I laid down a piece of beadboard (with the grooves […]
After a long hiatus, I’m back to work on the Victorianna’s master bathroom. The problem with getting distracted mid-project is that it takes a while to remember what I was doing and what I planned to do next. The last time I worked on this, I had made good progress on the vanity and linen […]
I’m waiting for supplies for the Blackbird Bar to come in the mail so I switched back to the Victorianna to get some work done on the towers. Here’s how they looked the last time I worked on them. A couple things were bothering me. One, the base of the big tower roof, which is […]
I started cross stitching a rug for the Victorianna’s nursery in July and finally finished it this week. It shouldn’t have taken that long, but I’ve been working on a life-sized cross stitch project and have only been squeezing in a couple of evenings a month on the rug. I adapted this pattern from a […]
With work on the exterior towers (mostly) done, it seems safe to assemble the Victorianna’s second floor porch railing. I was putting it off to prevent knocking into it, plus the porch has made a great platform for holding tower pieces as I’ve been working on them… There were some gaps between the porch floorboards […]
With the 1:48 gazebo bashed beyond recognition and the spiral staircase finished, it’s time to assemble the Victorianna’s cupola. The first step was to glue crown molding around the top for the cupola to sit on. I used a scrap of wood as a spacer to ensure the base would be flush with the tops […]
My first experience using Gallery Glass was in the Oak Shadow roombox, in a Guys from Texas class a million years ago. This was a 1:12, Craftsman style window with a very simple design, and we used silver tape to create the lead lines. I never got around to creating a gallery for this roombox, […]
Like the big tower roof that I completed in September, the roof of the Victorianna’s gazebo-turned-cupola is made from a wooden bell that I bought off Etsy. It’s slightly smaller than the octagonal base it’s sitting on, so I had previously added 1:12 crown molding around the edges of the base. That helped, but having […]
Continuing with the Victorianna’s spiral staircase — I wasn’t happy with how the stain turned out on the top step, so I painted it to match the landing. I filled in the laser cut part with wood filler. That piece needed to be “bad side up” for it to face the right direction, so the […]
The cupola on the Victorianna’s right-hand tower started out as a 1:48 scale gazebo. But because there’s no separation between the cupola and the tower room below, I wanted the cupola to be enclosed rather than “open air” like a gazebo. The bottom level of the towers has 1:12 corner blocks underneath the windows. They […]
I’ve finally reached the point on the Victorianna where I can glue on the front roof pieces. Yay, progress! My plan was to add fishscale shingles to the top portions of the towers. I got these from Alpha Stamps. I don’t know why, but even though it looked great in my head, I hated this […]
The back-to-back Victorianna has two towers, which I enclosed with French doors to turn into little rooms. The one in the master bedroom will be a small office / writing room. The other tower is attached to the nursery, and I couldn’t think of anything that a baby would need in an enclosed room besides […]